Future engineering work

PAGE LAST UPDATED: 20/11/2017 15:43. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Great Western Railway service to and from London Paddington on Saturday 11 November

Start date
11/11/2017  00:00
End date
11/11/2017 
Route affected
Download map of route afected

All Great Western Railway routes to and from London Paddington

 
TOC(s) affected
Great Western Railway
Description

Engineering work is taking place between London Paddington and Ealing Broadway, closing 2 out of the 4 lines between these stations.

An amended Great Western Railway service will run to and from London Paddington. Trains will be retimed and run with amended calling patterns.

Some services between London Paddington and Worcester / Great Malvern / Hereford will call additionally at Twyford.

The 23:42 London Paddington to Twyford service will terminate at Maidenhead. A connecting bus service will run from Maidenhead to Reading, calling at Twyford.

Stopping services between London Paddington and Oxford will be amended to run as 2 separate services, one between London Paddington and Maidenhead and one between Maidenhead and Oxford.

The 23:33 London Paddington to Oxford will be replaced by a bus between Reading and Oxford.

Trains that usually run between London Paddington and Greenford will be amended to run hourly between Ealing Broadway and Greenford. This is with the exception of the 05:40 London Paddington to Greenford and the 22:04 Greenford to London Paddington services which will still run. The 05:40 service will not call at Acton Main Line.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Project Information:

You can read more about engineering work and why it is necessary.