Future engineering work

PAGE LAST UPDATED: 18/11/2017 19:16. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Teddington and Shepperton on Sunday 10 December

Start date
10/12/2017  00:00
End date
10/12/2017 
Route affected
Download map of route afected

Between London Waterloo and Shepperton and between London Waterloo and Kingston via Hounslow

 
TOC(s) affected
South Western Railway
Description

Work on the signalling equipment is taking place between Teddington and Shepperton closing the line.

Trains between London Waterloo and Shepperton are diverted after Teddington to terminate at Twickenham. Buses will run between Teddington and Shepperton.

Trains between London Waterloo and Kingston via Hounslow are diverted after Hounslow to run to Windsor & Eton Riverside, calling additionally at Feltham and Staines. Customers for Twickenham should change at Feltham for an alternative train service.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.