Future engineering work

PAGE LAST UPDATED: 24/11/2017 11:24. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Heathrow Connect and Heathrow Express services on Saturday 09 and Sunday 10 December

Start date
09/12/2017  00:00
End date
10/12/2017 
Route affected
Download map of route afected

Trains between London Paddington and Heathrow Airport T123 / Heathrow Airport T5

 
TOC(s) affected
Heathrow ConnectHeathrow Express
Description

Engineering work is taking place between London Paddington and Heathrow Airport, closing some lines.

Heathrow Connect

Saturday - The 04:42, 05:13 and the 05:33 services from London Paddington will terminate at Heathrow T123. From 06:00 trains will depart from Ealing Broadway at 06:13 and then every 30 minutes until 19:43. Two additional services will run at 20:14 and 21:43. Trains from Heathrow at 05:29, 05:53 and then every 30 minutes until 20:53 will terminate at Ealing Broadway. The 00:07 from Heathrow will run through to London Paddington.

Sunday - Trains will depart London Paddington every hour from 07:12 until 23:12. Trains from Heathrow will start at 07:07, hourly until 00:07.

Heathrow Express

Saturday - The 23:25 from London Paddington and the 23:42 from Heathrow T5 are cancelled.

Sunday - Trains will depart London Paddington at 06:40 and then every 15 minutes until 23:25. Services from Heathrow T5 will depart at 06:48 and then every 15 minutes until 23:48.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

Project Information:

You can read more about engineering work and why it is necessary.