Future engineering work

PAGE LAST UPDATED: 21/11/2017 04:39. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Reduced London Overground service at Bethnal Green on Sunday 28 January

Start date
28/01/2018  00:00
End date
28/01/2018 
Route affected
Download map of route afected

Trains between London Liverpool Street and Chingford

 
TOC(s) affected
London Overground
Description

Engineering work is taking place between London Liverpool Street and Bethnal Green, reducing line capacity at the station.

Trains which run between London Liverpool Street and Chingford will not call at Bethnal Green. Customers should use alternative services on routes to and from Enfield Town and Cheshunt.

Customers may need to circulate via an alternative station such as Hackney Downs.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Project Information:

There are around 40,000 bridges and tunnels across the railway network. Each of these require inspection and maintenance on a regular basis to ensure that trains can run reliably and safely throughout the year.

The work can include but is not limited to replacement of tunnel linings, drainage, bridge beams and structures.