Future engineering work

PAGE LAST UPDATED: 22/05/2018 10:53. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Reading and Basingstoke after 21:00 on Saturday 23 and Sunday 24 June

Start date
23/06/2018  00:00
End date
24/06/2018 
Route affected
Download map of route afected

CrossCountry between Newcastle / Manchester Piccadilly / Oxford and Southampton Central / Bournemouth

Great Western Railway between Reading and Basingstoke

 
TOC(s) affected
CrossCountryGreat Western Railway
Description

Engineering work is taking place between Reading and Basingstoke after 21:00 each night, closing all lines.

CrossCountry:

The following services will be diverted, and will not call at Basingstoke, Winchester and Southampton Airport Parkway. Journey times will be extended by up to an hour. A replacement bus will run between Reading and Basingstoke. Customers for Winchester and Southampton Airport Parkway should change at Basingstoke for rail connections. 

Saturday:

  • 17:32 Newcastle to Southampton Central.
  • 18:27 Manchester Piccadilly to Bournemouth (terminates at Southampton Central).
  • 19:27 Manchester Piccadilly to Southampton Central (terminates at Eastleigh).
Sunday:
 
The 21:16 Oxford to Southampton Central 

Great Western Railway:
It is not yet known how Great Western Railway services will be affected by this engineering work.

 

Check before you travel:

If you are travelling with CrossCountry, please use the National Rail Enquiries Journey Planner

If you are travelling with Great Western Railway, these changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.