Future engineering work

PAGE LAST UPDATED: 25/09/2018 22:15. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service between East Croydon and Gatwick Airport until 07:20 on Sunday 17 June

Start date
17/06/2018  00:00
End date
17/06/2018 
Route affected
Download map of route afected

Gatwick Express between London Victoria and Gatwick Airport

Southern between London Bridge / London Victoria and Three Bridges / Brighton

Thameslink between London Bridge and Three Bridges / Brighton

 
TOC(s) affected
SouthernThameslink
Description

Engineering work is taking place between East Croydon and Gatwick Airport, closing some lines.

Gatwick Express:

The 05:00 and 05:30 London Victoria to Gatwick Airport and 05:48 and 06:18 Gatwick Airport to London Victoria services will not run, and will be replaced by buses.

Southern:

Services between East Croydon and Three Bridges will be diverted, and will take up to 20 minutes longer than usual.

Thameslink: 

Services between East Croydon and Gatwick Airport will be diverted, and will take up to 15 minutes longer than usual.

The 05:52 Three Bridges to London Bridge service will not call at Horley, Salfords or Earlswood. A replacement bus will run between Gatwick Airport and Redhill.

Check before you travel:

You can check your journey using the National Rail Enquiries real-time Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.