Future engineering work

PAGE LAST UPDATED: 12/12/2018 21:12. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended 03:24 service from Peterborough to London Kings Cross on Monday 9 July

Start date
09/07/2018  00:00
End date
09/07/2018 
Route affected

Between Peterborough and London Kings Cross

 
TOC(s) affected
Thameslink
Description

Engineering work is taking place between Hitchin and Biggleswade until 04:30, closing some lines.

As a result, the 03:24 Peterborough to London Kings Cross service will not call at Arlesey.

A replacement bus service will operate between Hitching and Biggleswade, calling at Arlesey.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.