Future engineering work

PAGE LAST UPDATED: 21/09/2018 03:57. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Shenfield and Southminster / Southend Victoria on Saturday 15 and Sunday 16 September

Start date
15/09/2018  00:00
End date
16/09/2018 
Route affected
Download map of route afected

Between London Liverpool Street and Southminster / Southend Victoria

 
TOC(s) affected
Greater Anglia
Description

Engineering work is taking place between Shenfield and Southminster, and also between Shenfield and Southend Victoria.

As a result, replacement buses will run between Shenfield and Southminster, and between Shenfield and Southend Victoria.

Ticket acceptance:

Season tickets valid for 1 month or longer from stations on the Southend Victoria line will be accepted on c2c services between Southend Central and London.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.