Future engineering work

PAGE LAST UPDATED: 17/07/2018 10:18. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Lewisham and Dartford via Bexleyheath on Saturday 22 and Sunday 23 September

Start date
22/09/2018  00:00
End date
23/09/2018 
Route affected
Download map of route afected

Between London Charing Cross and Dartford via Bexleyheath / Sidcup and

London Cannon Street and Slade Green via Bexleyheath and

London Cannon Street and Barnehurst via Greenwich

 
TOC(s) affected
Southeastern
Description

Engineering work is taking place between Blackheath and Barnehurst, closing all lines.

Buses will operate between Lewisham and Dartford via Bexleyheath.

  • London Charing Cross to Dartford (via Bexleyheath) WILL NOT RUN.
  • London Cannon Street to Slade Green (via Bexleyheath) WILL NOT RUN.
  • London Cannon Street to Barnehurst (via Greenwich) WILL NOT RUN.
  • London Victoria to Gravesend (via Bexleyheath) will be re-timed form Lewisham and divert to call all stations to Sidcup.
  • London Charing Cross to Dartford (via Sidcup) WILL NOT RUN. 
  • On Sunday, London Victoria to Dartford services will be diverted via Sidcup.

 

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.