Future engineering work

PAGE LAST UPDATED: 16/07/2018 07:59. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended morning services between Bradford Interchange and London Kings Cross on Sunday 30 September

Start date
30/09/2018  00:00
End date
30/09/2018 
Route affected
Download map of route afected

Grand Central between Bradford Interchange and London Kings Cross

 
TOC(s) affected
Grand Central
Description

Engineering work is taking place between Huntingdon and Sandy, closing some lines.

As a result, the following services will be retimed, and will depart stations later than usual:

  • The 07:55 Bradford Interchange to London Kings Cross.
  • The 11:50 London Kings Cross to Bradford Interchange.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.