Future engineering work

PAGE LAST UPDATED: 18/10/2018 19:17. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Shenfield and Wickford on Saturday 29 and Sunday 30 September

Start date
29/09/2018  00:00
End date
30/09/2018 
Route affected
Download map of route afected

Greater Anglia between London Liverpool Street and Southend Victoria / Southminster

 
TOC(s) affected
Greater Anglia
Description

Engineering work is taking place between Shenfield and Wickford all day on Saturday and Sunday, closing all lines.

As a result, buses will replace trains between Shenfield and Wickford.

Ticket acceptance:

Season tickets valid for 1 month or longer from stations on the Southend Victoria line will be accepted on c2c services between Southend Central and London.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about overhead power cables and why it is necessary.