Future engineering work

PAGE LAST UPDATED: 26/09/2018 15:53. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

No Gatwick Express trains between Gatwick Airport and Brighton on Saturday 10 November

Start date
10/11/2018  00:00
End date
10/11/2018 
Route affected
Download map of route afected

Between London Victoria and Brighton

 
TOC(s) affected
Gatwick Express
Description

Engineering work is taking place between Three Bridges and Brighton / Lewes closing the line.

Gatwick Express trains will only run between London Victoria and Gatwick Airport. These trains will not run between Gatwick Airport and Brighton.

If you are travelling between London Victoria and Brighton please use Southern direct services which will be operating via an alternative route.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.

Project Information:

You can read more about engineering work and why it is necessary.