Future engineering work

PAGE LAST UPDATED: 14/11/2018 15:41. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended late night service between Taunton and Tiverton Parkway on Monday 19, Tuesday 20 and Thursday 22 November

Start date
19/11/2018  00:00
End date
20/11/2018 
Route affected

Between London Paddington and Plymouth / Exeter St Davids, and also between Bristol Temple Meads and Exeter St Davids

 
TOC(s) affected
Great Western Railway
Description

Track renewals and maintenance is taking place between Taunton and Tiverton Parkway, closing 1 of the 2 lines.

Monday 19 November

  • 21:03 London Paddington to Plymouth will depart Tiverton Parkway and beyond up to 10 minutes later than normal
  • 21:45 London Paddington to Exeter St Davids, as well as 21:54 and 23:06 Bristol Temple Meads to Exeter St Davids will arrive at Tiverton Parkway and Exeter St Davids up to 10 minutes later than normal

Tuesday 20 November

  • 21:45 London Paddington to Exeter St Davids and 23:06 Bristol Temple Meads to Exeter St Davids will arrive at Tiverton Parkway and Exeter St Davids up to 15 minutes later than normal

Thursday 22 November

  • 21:03 London Paddington to Plymouth will depart Tiverton Parkway and beyond up to 10 minutes later than normal
  • 21:45 London Paddington to Exeter St Davids, as well as 21:54 and 23:06 Bristol Temple Meads to Exeter St Davids will arrive at Tiverton Parkway and Exeter St Davids up to 10 minutes later than normal

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Project Information:

You can read more about engineering work and why it is necessary.