Future engineering work

PAGE LAST UPDATED: 23/03/2019 02:55. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Weybridge and Guildford / Basingstoke / Andover on Sunday 17 March

Start date
17/03/2019  00:00
End date
17/03/2019 
Route affected
Download map of route afected

South Western Railway between London Waterloo and Guildford / Southampton Central / Portsmouth Harbour / Poole / Weymouth / Exeter St Davids, and also between Poole and Eastleigh, and between Woking and Alton

 
TOC(s) affected
South Western Railway
Description

Engineering work is taking place between Weybridge and Fleet,  and also between Weybridge and Andover, closing all lines.

Trains will run to an amended timetable with some services being cancelled, or diverted via an alternative route. Some services will start and terminate at alternative stations than normal.

Until 15:40, buses replace trains between:

  • Winchester and Woking.
  • Andover and Woking.

Buses replace trains all day between:

  • Weybridge and Woking.
  • Basingstoke and Woking.
  • Basingstoke and Weybridge.
  • Weybridge and Guildford.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Bicycles:

Non folding bicycles are not allowed on rail replacement bus services at any time. Folding bicycles are allowed if fully folded. For more information, please see here.