Future engineering work

PAGE LAST UPDATED: 17/01/2019 15:18. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended train service to / from London Kings Cross on Sunday 24 March

Start date
24/03/2019  00:00
End date
24/03/2019 
Route affected
Download map of route afected

Grand Central between London Kings Cross and Bradford Interchange / Sunderland

Great Northern between London Kings Cross and Peterborough / Cambridge

Hull Trains between London Kings Cross and Hull

London North Eastern Railway between London Kings Cross and Leeds / York / Newcastle / Edinburgh / Inverness / Aberdeen

Thameslink between London Kings Cross and Peterborough / Cambridge

 
TOC(s) affected
Grand CentralGreat NorthernHull TrainsLondon North Eastern RailwayThameslink
Description

Engineering work is taking place in the New Barnet area, closing some lines.

Grand Central:

An amended timetable will operate, with journey times extended by a few minutes.

Great Northern / Thameslink:

Trains between London King's Cross and Stevenage, Peterborough, Cambridge and King's Lynn will be diverted between Alexandra Palace and Stevenage and will be unable to call at stations via Welwyn Garden City. A revised timetable will operate with extended journey times.

Replacement buses will operate calling at stations between Alexandra Palace and Stevenage via Welwyn Garden City.

Hull Trains:

An amended timetable will operate, with journey times extended by a few minutes.

London North Eastern Railway:

It is not yet known how LNER will be affected by this engineering work.

 

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.