Future engineering work

PAGE LAST UPDATED: 26/04/2019 05:40. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service to / from London Waterloo on Saturday 13 April

Start date
13/04/2019  00:00
End date
13/04/2019 
Route affected
Download map of route afected

Between London Waterloo and Windsor & Eton Riverside / Reading / Weybridge via Brentford / London Waterloo

 
TOC(s) affected
South Western Railway
Description

Engineering work is taking place between London Waterloo and Barnes, closing some lines.

As a result of this, the following alterations will be in place:

  • Trains between London Waterloo and Windsor & Eton Riverside / Reading will start / terminate at Clapham Junction.
  • Trains between London Waterloo and Weybridge via Brentford will start / terminate at Clapham Junction.
  • 27 & 57 minutes past the hour London Waterloo to London Waterloo via Kingston will terminate at Clapham Junction.
  • 03 & 33 minutes past the hour London Waterloo to London Waterloo via Twickenham will start at Clapham Junction.
  • 07 & 37 minutes pas the hour London Waterloo to London Waterloo via Brentford will not run.
  • 15 & 45 minutes past the hour London Waterloo to London Waterloo via Twickenham will not run.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner