Future engineering work

PAGE LAST UPDATED: 23/02/2019 03:24. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service between Lewisham / Bickley and Orpington on Sunday 21 April

Start date
21/04/2019  00:00
End date
21/04/2019 
Route affected
Download map of route afected

Southeastern between London Charing Cross and Orpington / Sevenoaks / Tonbridge / Hastings, and between London Victoria and Orpington

Thameslink between London Victoria and Orpington

 
TOC(s) affected
SoutheasternThameslink
Description

Engineering work is taking place between Grove Park / Bickley and Petts Wood, closing some lines.

Southeastern

  • Trains from London Charing Cross to Sevenoaks will run later than normal from Lewisham
  • Trains from London Victoria to Orpington will run approximately 4 minutes later from Petts Wood
  • All other trains between Grove Park and Petts Wood may be slightly retimed

 

Thameslink

It is not yet known how Thameslink will be affected by this engineering work.

 

Check before you travel:

If you are travelling with Southeastern, you can plan your journey using the National Rail Enquiries Journey Planner

If you are travelling with Thameslink, these changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.