Future engineering work

PAGE LAST UPDATED: 25/03/2019 16:14. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Shenfield and Southend Victoria / Southminster from Saturday 4 to Monday 6 May

Start date
04/05/2019  00:00
End date
06/05/2019 
Route affected
Download map of route afected

Between London Liverpool Street and Southend Victoria  / Southminster

 
TOC(s) affected
Greater Anglia
Description

Overhead electric wire renewal work is taking place between Shenfield and Southend Victoria / Southminster closing the line.

Buses will replace trains between Shenfield and Southend Victoria / Southminster.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Project information:

As part of the Railway Upgrade Plan, Network Rail are replacing the overhead wiring system on the Southend Victoria branch line as part of a £46m investment. The wiring system currently in place along the route was installed in the 1950s and needs replacing to prevent frequent failures that cause delays, in order to improve reliability of the rail service.