Future engineering work

PAGE LAST UPDATED: 24/04/2019 15:10. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Wickford and Southend Victoria from Saturday 25 May to Sunday 2 June

Start date
25/05/2019  00:00
End date
02/06/2019 
Route affected
Download map of route afected

Between London Liverpool Street and Southend Victoria 

 
TOC(s) affected
Greater Anglia
Description

Overhead electric wire renewal work is taking place between Wickford and Southend Victoria, closing all lines.

Buses will replace trains between Wickford and Southend Victoria.

Trains will run between Wickford and Southminster.

Ticket acceptance:

Monthly or longer season tickets can be used on c2c services.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages

Replacement Bus Travel Advice:

Bicycles are not allowed on rail replacement bus services at any time, unless fully folded. More travel advice for your replacement bus journey is available by selecting the Train Operating Company you are travelling with here.

Project Information:

As part of the Railway Upgrade Plan, Network Rail are replacing the overhead wiring system on the Southend Victoria branch line as part of a £46m investment. The wiring system currently in place along the route was installed in the 1950s and needs replacing to prevent frequent failures that cause delays, in order to improve reliability of the rail service.