Engineering Work

Engineering work between Bristol Parkway and Severn Tunnel Junction on Saturday 7 June 2008

Start date 07/06/2008
End date 07/06/2008
Route Affected
All routes that operate between Cardiff Central and Bristol
TOC(s) Affected First Great Western, CrossCountry
Description

First Great Western:

Services between London Paddington and South Wales

These services are diverted between Swindon and Newport not calling at Bristol Parkway but calling additionally at Kemble, Stroud, Stonehouse and Gloucester

Services between London Paddington / Swindon and Cheltenham Spa

These services are cancelled. Passengers are advised to use the diverted South Wales services to stations to Gloucester and alternative services between Gloucester and Cheltenham Spa

Services between Cardiff Central and Portsmouth Harbour

These services will start/terminate at Bristol Parkway. Replacement road transport is in operation between Bristol Parkway and Newport. Alternative services are to be used between Newport and Cardiff Central

Services between Cardiff Central and Weston-super-Mare / Taunton

These services will start/terminate at Bristol Temple Meads. Alternative services are to be used between Bristol Temple Meads and Cardiff Central

CrossCountry:

CrossCountry services will start/terminate at Bristol Temple Meads ot Bristol Parkway

Service Alterations and Engineering Works index

QUICK JOURNEY PLANNER

From (station):

To (station):

Date:
calendar
Time:
More search options

LIVE DEPARTURES & ARRIVALS




Limit by:(optional)

Accessible version?