Engineering Work

Engineering work at London Cannon Street station on Saturday 10 May 2008

Start date 10/05/2008
End date 10/05/2008
Route Affected
London Cannon Street, London Bridge, Maidstone East, and Ashford international
TOC Affected Southeastern
Description

Saturday 10 May:

Southeastern services between London Cannon Street and Ashford International will start / terminate at London Bridge.

Passengers travelling to and from London Cannon Street are advised to change at London Bridge for connecting Southeastern services.

Additional Maps
Service Alterations and Engineering Works index

QUICK JOURNEY PLANNER

From (station):

To (station):

Date:
calendar
Time:
More search options

LIVE DEPARTURES & ARRIVALS




Limit by:(optional)

Accessible version?