April 2018

    May 2018

    June 2018

    July 2018

    Mo Tu We Th Fr Sa Su
          1
    2345678
    9101112131415
    16171819202122
    2324252627 28 29
    30       
    Mo Tu We Th Fr Sa Su
     1 2 3 4 5 6
    7 8 9 10 11 12 13
    14 15 16 17 18 19 20
    21 22 23 24 25 26 27
    28 29 30 31    
    Mo Tu We Th Fr Sa Su
        1 2 3
    4 5 6 7 8 9 10
    11 12 13 14 15 16 17
    18 19 20 21 22 23 24
    25 26 27 28 29 30  
    Mo Tu We Th Fr Sa Su
          1
    2 3 4 5 6 7 8
    9 10 11 12 13 14 15
    16 17 18 19202122
    23242526272829
    3031     

    Stations & on train

     

    Map key

    Cycle Rack/Storage
    Entrance
    Female and Accessible Toilet
    Help point
    Male Toilets
    Ramp
    Seats
    Single/Double Doors
    Stairs
    Taxi and Drop Off Point
    Ticket Machine
     
    Top

    Dorchester South

    Ground Floor

    Help Point Ticket Machine Ticket Machine Doors Bike Seats Seats Seats Help Point Seats Taxi & Drop Off Male Toilet Unisex Accessible Toilet Stairs to Ticket Office Main Entrance Cromwell Road Entrance Side Entrance Toilet Block Platform 2 multi-stairs Platform 1 multi-stairs Shelter Shelter Ramp Bridge Ticket Office Pathway Road leading to Weymouth Avenue Car Park Cromwell Road Station Approach Platform 2 Station Exit Road Platform 1 Construction Area
    o1647-0010978_thumb.jpg

    The Help Point is white.
    What is the measurement of the Help point from floor to button in metres: 1.17
    The Help Point has an induction loop fitted.
    There is contact options for both Information and Emergencies.

    o1647-0000067_thumb.jpg

    The ticket machine accepts coins and payment cards.
    How many of this type of machine are there: 1
    Prepaid tickets cannot be collected.

    o1647-0000019_thumb.jpg

    The ticket machine accepts coins and payment cards.
    How many of this type of machine are there: 1
    Prepaid tickets cannot be collected.

    o1647-0000026_thumb.jpg

    There is a single door.
    The door(s) open inwards.
    The doorway is wide enough for all users.
    Door handles are within reach of all users.

    o1647-0000012_thumb.jpg

    Cycles are stored in Racks
    How many cycle racks: 10
    The cycle racks are not covered.

    o1647-0000028_thumb.jpg

    How many individual seats (Benches count as 1): 6

    o1647-0000052_thumb.jpg

    How many individual seats (Benches count as 1): 2

    o1647-0000055_thumb.jpg

    How many individual seats (Benches count as 1): 1

    o1647-0010975_thumb.jpg

    The Help Point is white.
    What is the measurement of the Help point from floor to button in metres: 1.19
    The Help Point has an induction loop fitted.
    There is contact options for both Information and Emergencies.

    o1647-0000071_thumb.jpg

    How many individual seats (Benches count as 1): 1

    o1647-0000008_thumb.jpg

    Taxi & Drop Off
    The drop off point is clearly signed from the main entrance and/or from the approach to the station.
    There is enough room to accommodate safe side and rear loading.
    There is direct level access from the drop off point to the pavement or designated pedestrianised area.
    The footpath routes from the designated parking/drop off point are on an even surface.

    o1647-0000029_thumb.jpg

    There are male toilet facilities available.

    o1647-0010963_thumb.jpg

    There are unisex accessible toilet facilities available.

    o1647-0000014_thumb.jpg

    Stairs to Ticket Office
    The stairs are outdoors.
    No of steps: 5

    o1647-0004010_thumb.jpg

    Main Entrance
    This is an entrance and exit.
    There is no safe crossing.

    o1647-0000066_thumb.jpg

    Cromwell Road Entrance
    This is an entrance and exit.
    There is a raised crossing.
    There are no entry doors.
    Wheelchair users can use the entrance unaided.

    o1647-0000046_thumb.jpg

    Side Entrance
    This is an entrance and exit.
    There is a raised crossing.
    There are no entry doors.
    The approach to the entrance may cause difficulty for some users.
    There is a step to the Entrance.
    Wheelchair users may need assistance using the entrance.
    There is a step to the Entrance.

    Toilet Block

    o1647-0000061_thumb.jpg

    Platform 2 multi-stairs
    The stairs are outdoors.
    Number of Steps: 15,12
    There is a visual contrast between the step edge and the tread.

    o1647-0000057_thumb.jpg

    Platform 1 multi-stairs
    The stairs are outdoors.
    Number of Steps: 13,12
    There is a visual contrast between the step edge and the tread.

    o1647-0000068_thumb.jpg

    Shelter

    o1647-0000059_thumb.jpg

    Shelter

    o1647-0000010_thumb.jpg

    Ramp
    Distance in metres: 17
    The ramp has a shallow gradient.

    o1647-0000060_thumb.jpg

    Bridge

    o1647-0000020_thumb.jpg

    Ticket Office
    How many windows: 2
    The chip and PIN pad can be moved
    There is an induction loop available.
    Wheelchair users can access all visitor areas and move around without obstruction.

    o1647-0010976_thumb.jpg

    Pathway

    o1647-0010953_thumb.jpg

    Road leading to Weymouth Avenue

    o1647-0000004_thumb.jpg

    Car Park
    No of Accessible spaces: 2
    There is no vehicle height restriction barrier at the entrance to the car park.
    A wheelchair user can get from the parking area to the station without assistance.

    o1647-0010981_thumb.jpg

    Cromwell Road

    o1647-0010954_thumb.jpg

    Station Approach

    o1647-0000063_thumb.jpg

    Platform Number: 2
    There is no staff assistance on the platform.
    There are train announcements.
    There are display boards on this platform.
    The display boards show the next departure.
    The display boards show the next few departures.

    o1647-0010955_thumb.jpg

    Station Exit Road

    o1647-0000049_thumb.jpg

    Platform Number: 1
    There is no staff assistance on the platform.
    There are train announcements.
    There are display boards on this platform.
    The display boards show the next departure.
    The display boards show the next few departures.

    o1647-0010959_thumb.jpg

    Construction Area