April 2019

    May 2019

    June 2019

    July 2019

    Mo Tu We Th Fr Sa Su
    1234567
    891011121314
    15161718192021
    222324 25 26 27 28
    29 30      
    Mo Tu We Th Fr Sa Su
      1 2 3 4 5
    6 7 8 9 10 11 12
    13 14 15 16 17 18 19
    20 21 22 23 24 25 26
    27 28 29 30 31   
    Mo Tu We Th Fr Sa Su
         1 2
    3 4 5 6 7 8 9
    10 11 12 13 14 15 16
    17 18 19 20 21 22 23
    24 25 26 27 28 29 30
    Mo Tu We Th Fr Sa Su
    1 2 3 4 5 6 7
    8 9 10 11 12 13 14
    15 161718192021
    22232425262728
    293031    

    Stations & on train

     

    Map key

    Drop Off Point
    Entrance
    Seats
    Telephone
     
    Top

    Rhosneigr

    Ground Floor

    Seats Entrance to Platform 1 Telephones Drop Off Platform 2 Entrance Platform 1 Entrance Shelter Shelter Platform 2 Platform 1
    o2875-0000011_thumb.jpg

    How many individual seats (Benches count as 1): 1

    o2875-0000004_thumb.jpg

    Entrance and exit to Platform 1
     

    o2875-0000013_thumb.jpg

    How many are there: 1

    o2875-0000017_thumb.jpg

    Drop Off
    The drop off point is clearly signed from the main entrance and/or from the approach to the station.
    There is enough room to accommodate safe side and rear loading.
    There is direct level access from the drop off point to the pavement or designated pedestrianised area.
    The footpath routes from the designated parking/drop off point are on an even surface.
    The route from the designated drop off point is Level.
    Seating is not provided at intervals on long or inclined routes.

    o2875-0000018_thumb.jpg

    Platform 2: Entrance and Exit is via a gate

    o2875-0000005_thumb.jpg

    Platform 1 Entrance
    This is an entrance and exit.
    There is no safe crossing.

    o2875-0000012_thumb.jpg

    Shelter

    o2875-0000024_thumb.jpg

    Shelter
    There are seats in the shelter.
    How many individual seats (Benches count as 1): 1

    o2875-0000021_thumb.jpg

    Platform Number: 2 
    Assistance with boarding and alighting is provided by the conductor on the train.  Customer information screens display the time of the next train.
    This is a request stop station.
    A Harrington Hump is available on this platform to assist with boarding and alighting the train.

    o2875-0000008_thumb.jpg

    Platform Number: 1 
    Assistance with boarding and alighting is provided by the conductor on the train.  Customer information screens display the time of the next train.
    This is a request stop station.
    A Harrington Hump is available on this platform to assist with boarding and alighting the train.