Skip to main content

Advertisement

Amended Elizabeth line on Saturday 16 and Sunday 17 November 

See all service disruptions

Engineering work details

Starts 16 Nov 2024 to 17 Nov 2024

Train operators affected

Route(s) affected

Abbey Wood and Maidenhead / Heathrow Airport / Reading and also between Shenfield / Gidea Park and Paddington

Description

Engineering work is taking place between London Liverpool Street and London Paddington, closing all lines.

Saturday:

No trains between London Liverpool Street and London Paddington.

Trains between Shenfield and London Paddington will start terminate / start from London Liverpool Street High Level.

Trains to Reading will start / terminate at London Paddington High Level.

Trains to Maidenhead will start / terminate at London Paddington High Level.

Trains to Heathrow Airport will only run between London Paddington High Level and Hayes & Harlington and will be reduced to 2 trains per hour.

This means the following reduced service will operate:

Trains to Hayes & Harlington, Southall and Ealing Broadway will be reduced to 6 trains per hour.

West Ealing will be reduced to 4 trains per hour.

Maidenhead services will call addionally at Acton Main line, West Ealing and Hanwell.

Sunday:

No Trains between London Paddington and Heathrow Airport.

A reduced service will operate between Ealing Broadway and Reading. you should use London Underground between Central London and Ealing Broadway.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can plan your journey on London Underground by using the Transport for London Journey Planner

Advertisement