Amended Elizabeth line on Saturday 16 and Sunday 17 November
Train operators affected
Route(s) affected
Abbey Wood and Maidenhead / Heathrow Airport / Reading and also between Shenfield / Gidea Park and Paddington
Description
Engineering work is taking place between London Liverpool Street and London Paddington, closing all lines.
Saturday:
No trains between London Liverpool Street and London Paddington.
Trains between Shenfield and London Paddington will start terminate / start from London Liverpool Street High Level.
Trains to Reading will start / terminate at London Paddington High Level.
Trains to Maidenhead will start / terminate at London Paddington High Level.
Trains to Heathrow Airport will only run between London Paddington High Level and Hayes & Harlington and will be reduced to 2 trains per hour.
This means the following reduced service will operate:
Trains to Hayes & Harlington, Southall and Ealing Broadway will be reduced to 6 trains per hour.
West Ealing will be reduced to 4 trains per hour.
Maidenhead services will call addionally at Acton Main line, West Ealing and Hanwell.
Sunday:
No Trains between London Paddington and Heathrow Airport.
A reduced service will operate between Ealing Broadway and Reading. you should use London Underground between Central London and Ealing Broadway.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner
Advertisement