Skip to main content

Advertisement

Amended late night services between London Paddington and Heathrow Airport / Reading from Monday 2 to Wednesday 5 December 

See all service disruptions

Engineering work details

Starts 02 Dec 2024 to 04 Dec 2024

Train operators affected

Route(s) affected

Elizabeth Line between Shenfield / Abbey Wood and Heathrow Terminal 4 / Heathrow Terminal 5, between Abbey Wood / London Paddington and Reading

Great Western Railway between London Paddington and Didcot Parkway / Oxford / Worcester Foregate Street / Swansea

Description

Engineering work is taking place overnight as part of Project Brunel between London Paddington and Heathrow Airport / Reading, closing some lines.

Elizabeth Line

From 22:00 to the end of service Monday to Wednesday, services between Abbey Wood and Maidenhead will operate between Abbey Wood and London Paddington only.

Services to / from stations between London Paddington and Heathrow Airport / Reading will run to a reduced service and amended timetable.

Great Western Railway

The 20:23 Swansea to London Paddington service will arrive at 23:17.

The 20:56 Worcester Foregate Street to London Paddington service will arrive at 23:30.

The 22:49 London Paddington to Swansea service will depart earlier than usual at 22:46. It will run to revised timings throughout.

The 23:14 London Paddington to Oxford service will depart at 23:16 and will operate a few minutes later than normal throughout.

The 23:34 London Paddington to Didcot Parkway service will depart at 23:43 and will operate a few minutes later than normal as far as Twyford.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement