Future engineering work

PAGE LAST UPDATED: 21/07/2019 22:41. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service from London Paddington to Bristol Temple Meads on Sunday 10 March

Start date
10/03/2019  00:00
End date
10/03/2019 
Route affected
Download map of route afected

Trains from London Paddington to Bristol Temple Meads / Taunton / Penzance also between Twyford and Henley-on-Thames

 
TOC(s) affected
Great Western Railway
Description

Engineering work is taking place between Slough and Twyford closing 2 out of 4 lines.

The 03 minutes past the hour departures from London Paddington to Bristol Temple Meads and beyond, are retimed to depart London Paddington at 05 minutes past the hour.

As a result of this, trains between Twyford and Henley-on-Thames are retimed to run 1 minute later than normal.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner