Future engineering work

PAGE LAST UPDATED: 18/10/2019 22:32. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Southern and Thameslink services through Redhill on Saturday 28 and Sunday 29 September

Start date
28/09/2019  00:00
End date
29/09/2019 
Route affected
Download map of route afected

Southern between London Victoria and Reigate / Brighton / Horsham / Hastings / Chichester / Eastbourne / Portsmouth & Southsea / Ore / Southampton Central / Portsmouth Harbour / Bognor Regis

Thameslink between London Blackfriars / London Bridge and Horsham, between Royston and Gatwick Airport, and between Bedford and Brighton

Gatwick Express between London Victoria and Gatwick Airport Brighton

 
TOC(s) affected
SouthernThameslink
Description

Engineering work is taking place between East Croydon and Gatwick Airport, closing some lines.

Southern

Direct services between London Victoria and Reigate will not run.

Services between Redhill and Tonbridge will be extended to start / terminate at Reigate.

Thameslink

A revised timetable will operate between London Bridge and Brighton / Horsham.

Journey times will be extended by up to 10 minutes.

Trains from Brighton towards London will depart up to 5 minutes earlier than normal. 

Gatwick Express

A reduced half-hourly service will run between London Victoria and Gatwick Airport over the weekend. On Sunday no services will operate between Gatwick Airport and Brighton.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner