Future engineering work

PAGE LAST UPDATED: 20/09/2019 08:57. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended 22:56 & 23:49 Didcot Parkway to London Paddington services on Saturday 9 November

Start date
09/11/2019  00:00
End date
09/11/2019 
Route affected

Between Didcot Parkway and London Paddington

 
TOC(s) affected
Great Western Railway
Description

Engineering work is taking place on 3 out of 4 tracks between London Paddington and Southall from 23:45 until 23:59 on Saturday.

As a result of this, the following alterations will be in place:

22:56 Didcot Parkway to London Paddington will terminate at Slough. Replacement road transport will operate from Slough to London Paddington, calling at West Drayton, Hayes & Harlington, Southall and Ealing Broadway.

23:49 Didcot Parkway to London Paddington will also terminate at Slough. Replacement road transport will operate fast between Slough and London Paddington, with an additional bus calling at Langley, West Drayton, Hayes & Harlington, Southall and finally this bus will set down only at Ealing Broadway.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Replacement Bus Travel Advice:

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages.

Bicycles are not allowed on rail replacement bus services at any time, unless fully folded. More travel advice for your replacement bus journey is available by selecting the Train Operating Company you are travelling with here.