Future engineering work

PAGE LAST UPDATED: 14/10/2019 22:02. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended morning trains in the Norwich / Ipswich area on Sunday 22 December

Start date
22/12/2019  00:00
End date
22/12/2019 
Route affected

Greater Anglia between Norwich / Ipswich and Cambridge / London Liverpool Street

 
TOC(s) affected
Greater Anglia
Description

Engineering work is taking place between Stowmarket and Diss / Bury St Edmunds, closing lines until 08:00 on Sunday morning.

As a result:

  • The 06:52 Norwich to London Liverpool Street service will be amended to start from Ipswich at 07:35.
  • The 07:34 Ipswich to Cambridge will be amended to depart Ipswich at 07:45, and will run later than usual throughout.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.