Future engineering work

PAGE LAST UPDATED: 17/11/2019 11:11. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended Thameslink services in the London Bridge area on Sunday 15 December

Start date
15/12/2019  00:00
End date
15/12/2019 
Route affected
Download map of route afected

Thameslink between Bedford / Cambridge and Gatwick Airport / Three Bridges / Brighton

 
TOC(s) affected
Thameslink
Description

Engineering work is taking place between London Bridge and New Cross Gate, closing some lines.

A reduced Thameslink service will be in operation between Bedford and Gatwick Airport / Three Bridges.

Services between Cambridge and Gatwick Airport will be diverted, not calling at London Bridge. These services will additionally call at Earlswood and Salfords, and will be subject to extended journey times by up to 15 minutes.

Services between Bedford and Brighton will be diverted, not calling at London Bridge. Journey times will be extended by up to 15 minutes.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner