Future engineering work

PAGE LAST UPDATED: 21/01/2020 20:14. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended service to / from London Euston from Friday 10 to Monday 13 April

Start date
10/04/2020  00:00
End date
10/04/2020 
Route affected
Download map of route afected

Avanti West Coast to/ from London Euston

London Northwestern Railway to / from London Euston

London Overground between London Euston and Watford Junction

 
TOC(s) affected
Avanti West CoastLondon Northwestern RailwayLondon Overground
Description

Engineering work is taking place between Cheddington and Milton Keynes Central, closing 2 out of 4 lines.

Avanti West Coast

A revised timetable will operate.

London Northwestern Railway

Train services between London Euston and Watford Junction / Tring / Milton Keynes Central / Northampton will operate to a special timetable at a reduced level of frequency.

Trains between London Euston and Birmingham New Street / Rugeley Trent Valley / Liverpool Lime Street will run to a special timetable between Northampton and London Euston.

Train services between London Euston and Crewe (via Nuneaton & Tamworth) will run to an amended timetable between London Euston and Rugby. 

London Overground

It is not yet known how London Overground are afected by this engineering work.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner