Future engineering work

PAGE LAST UPDATED: 22/02/2020 06:24. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended overnight trains between Shenfield and Southend Victoria / Southminster from Monday 2 to Wednesday 4 March

Start date
02/03/2020  00:00
End date
05/03/2020 
Route affected

Between London Liverpool Street and Southend Victoria and between Wickford and Southminster

 
TOC(s) affected
Greater Anglia
Description

Overnight engineering work is taking place between Hockley and Southend Victoria, closing 1 out of 2 lines.

Some trains from London Liverpool Street to Southend Victoria will either terminate at Wickford or diverted to terminate at Southminster. 

Those trains that run through to Southend Victoria will have journey times extended after leaving Hockley.

Some trains between Wickford and Southminster are extended to run between London Liverpool Street and Southminster.

Some train between Southend Victoria and London Liverpool Street will be retimed to depart Southend Victoria earlier than normal with some trains being cancelled throughout.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner