Future engineering work

PAGE LAST UPDATED: 06/05/2021 05:25. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Buses replace trains between Warminster / Gillingham and Salisbury from Saturday 1 to Monday 3 May

Start date
01/05/2021  00:00
End date
03/05/2021 
Route affected
Download map of route afected

Great Western Railway between Cardiff Central and Portsmouth Harbour / Southampton Central / Brighton

South Western Railway between Exeter St Davids and London Waterloo and also between Bristol Temple Meads and Salisbury

 
TOC(s) affected
Great Western RailwaySouth Western Railway
Description

Engineering work is taking place between Warminster / Tisbury and Salisbury resulting in the closure of all lines.

Buses will replace trains between Warminster / Gillingham and Salisbury.

Great Western Railway:

The following alterations will only apply on Saturday:

Last service from Cardiff Central with connections available is the 20:30 Cardiff Central to Warminster which would be followed by road transport to Salisbury and a rail connection to Portsmouth Harbour.

Last services from Portsmouth Harbour with connections available:

  • 18:23 Portsmouth Harbour to Salisbury followed by road transport to Warminster and a rail connection to Cardiff Central.
  • 20:33 Portsmouth Harbour to Salisbury followed by road transport to Warminster and a rail connection to Bath Spa.
  • 21:23 Portsmouth Harbour to Salisbury followed by road transport to Warminster, setting down only at Dilton Marsh and Westbury.

The 06:43 Frome to Southampton Central and the 14:58 Frome to Warminster will both terminate at Westbury.

The 10:52 Great Malvern to Brighton and the 16:42 Great Malvern to Southampton Central will start from Bristol Parkway and terminate at Westbury.

The 05:24 Westbury to Salisbury, 05:50 Portsmouth Harbour to Brighton, 10:12, 17:11 Westbury to Warminster, 10:30 Warminster to Westbury and 11:12 Westbury to Southampton Central will not run.

The 06:08 Salisbury to Gloucester will start from Warminster and terminate at Bristol Parkway.

The 21:32 Southampton Central to Bath Spa will start from Warminster.

17:00 Brighton to Bristol Temple Meads will start from Westbury.

The following trains will start at Westbury and terminate at Bristol Parkway:

  • 08:30 and 12:27 Southampton Central to Great Malvern
  • 09:00 Brighton to Great Malvern 
  • 15:30 Warminster to Worcester Foregate Street
  • 17:30 Warminster to Great Malvern

A limited number of trains will call (upon request) at Dilton Marsh.

South Western Railway

The following alterations will apply on Saturday, Sunday and Monday:

Trains between Exeter St Davids and London Waterloo will run between Exeter St Davids and Gillingham.

The 47 minutes past the hour Salisbury to London Waterloo service will depart earlier at 18 minutes past the hour.

The 50 minutes past the hour London Waterloo to Salisbury service will depart earlier at 20 minutes past the hour.

Trains will not run between Bristol Temple Meads and Frome.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Although journey planners are showing correctly, your journey may be subject to alteration at short notice due to the Coronavirus outbreak. Please check before your journey.

Replacement Bus Travel Advice:

For helpful advice if you need to travel on a rail replacement service, including accessibility and bicycle information, please use this page.

You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages.