Future engineering work

PAGE LAST UPDATED: 16/10/2021 09:50. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

No trains at London Fenchurch Street on Saturday 27 and Sunday 28 November

Start date
27/11/2021 
End date
28/11/2021 
Route affected
Download map of route afected

All routes to / from London Fenchurch Street

 
TOC(s) affected
c2c
Description

Engineering work is taking place between London Fenchurch Street and Upminster, closing some lines.

Trains will be diverted to start / terminate at London Liverpool Street.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.