Skip to main content

Advertisement

Amended Elizabeth line services from Sunday 24 to Thursday 28 December 

See all service disruptions

Engineering work details

Starts 24 Dec 2023 to 28 Dec 2023

Train operators affected

Route(s) affected

All Elizabeth line routes

Description

Engineering work is taking place between London Paddington and Ealing Broadway, closing some lines.

Sunday 24 December:

Trains to / from Heathrow Airport / Reading will start / terminate at Ealing Broadway.

  • 2 trains per hour will operate between Ealing Broadway and Heathrow Terminal 5.

  • 2 trains per hour will operate between Ealing Broadway and Reading.

Trains will call at all stations.

All Abbey Wood services will start / terminate at London Paddington low level.

All Shenfield to Heathrow Terminal 5 services will start / terminate at London Paddington low level.

Monday 25 December:

No service.

Tuesday 26 December:

No service.

Wednesday 27 December:

Trains to / from Heathrow Airport / Reading will start / terminate at Ealing Broadway.

  • 2 trains per hour will operate between Ealing Broadway and Heathrow Terminal 5.

  • 2 trains per hour will operate between Ealing Broadway and Reading.

Trains will call at all stations.

All Abbey Wood services will start / terminate at London Paddington low level.

All Shenfield to Heathrow Terminal 5 services will start / terminate at London Paddington low level.

Thursday 28 December:

A Saturday service will operate.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement