Skip to main content

Advertisement

Amended Elizabeth line services in the Abbey Wood area on Sunday 29 September 

See all service disruptions

Engineering work details

Starts 29 Sep 2024 to 29 Sep 2024

Train operators affected

Route(s) affected

Various Elizabeth line routes in the Abbey Wood area

Description

Engineering work is taking place between London Paddington and Reading, closing various lines.

  • Services between Abbey Wood and Maidenhead will terminate / start at London Paddington Lower Level.

  • A reduced service will run between Abbey Wood and Heathrow Terminal 4, of only two trains per hour.

  • Services between Shenfield and Heathrow Terminal 5 will start / terminate at Abbey Wood.

  • A reduced service will run between Maidenhead, Burnham, Slough, Langley, West Drayton and Heathrow Terminal 4 of only 2 trains per hour.

  • A reduced service will run between Hayes & Harlington, Southall and Ealing Broadway of only 6 trains per hour.

  • Services between Abbey Wood calling at Acton Main Line, West Ealing and Hanwell will not run.

  • Services between Abbey Wood and Reading will now call at Iver.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement