Skip to main content

Advertisement

Last updated:Today at 10:28
Train companies affected:Transport for Wales

Reduced Thameslink service to / from London Bridge and no trains to / from Sutton via Mitcham Junction on Saturday 9 and Sunday 10 November 

See all service disruptions

Engineering work details

Starts 09 Nov 2024 to 10 Nov 2024

Train operators affected

Route(s) affected

Thameslink between Bedford / Peterborough / Cambridge and Three Bridges, and between Bedford / Peterborough / Cambridge and Horsham, and between Bedford / Peterborough / Cambridge and Brighton, and between Bedford / Luton / St Albans and Sutton (via Mitcham Junction)

Description

Engineering work is taking place between in the Herne Hill area, closing various lines.

London Bridge area:

Saturday and Sunday:

Trains between Bedford / Peterborough / Cambridge and Three Bridges / Horsham / Brighton will be diverted between London Blackfriars and East Croydon, and will run to an amended timetable. This means that Thameslink will be running a reduced service to / from / via London Bridge.

Saturday:

A reduced and amended service will run between London Blackfriars and Three Bridges.

Thameslink trains between Luton and Rainham will run to an amended timetable.

To / from Sutton via Mitcham Junction:

Saturday and Sunday:

Thameslink trains will not run to / from Sutton via Mitcham Junction.

You can use your tickets on Southern services, and paper tickets will be accepted on London Buses.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can plan your journey on London Buses by using the Transport for London Journey Planner

Advertisement