Skip to main content

Advertisement

Amended Thameslink service through London Bridge on Saturday 10 and Sunday 11 August  

See all service disruptions

Engineering work details

Starts 10 Aug 2024 to 11 Aug 2024

If you would like to follow this incident on X, please use

Train operators affected

Route(s) affected

Between Bedford / Cambridge and Brighton, between Luton and Rainham (Kent), and also between Peterborough and Horsham

Description

Engineering work is taking place between London Bridge and East Croydon, closing some lines.

As a result of this, the following alterations will apply:

  • Services between Bedford / Cambridge / Peterborough and Gatwick Airport / Horsham / Brighton will be diverted between London Blackfriars and East Croydon, not calling at London Bridge, services are subject to extended journey times.

  • A reduced service will run between London Blackfriars and Three Bridges.

  • Services between Luton / London Blackfriars and Sutton via Mitcham Junction will not run. You can use Southern services to / from London Victoria to complete your journey.

The following services will be subject to minor retiming:

  • Between Luton and Rainham

  • Between Luton / London Blackfriars and Sutton via Wimbledon

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement