Future engineering work

PAGE LAST UPDATED: 31/05/2020 11:14. Update now

See details of routes affected by planned engineering works, including when they take effect, maps of the affected area, alternative timetables, advice for alternative travel and real-time updates.

Amended 04:53 Bristol Temple Meads to London Paddington service from Tuesday 28 to Friday 31 July

Start date
28/07/2020  00:00
End date
31/07/2020 
Route affected

Between Bristol Temple Meads and London Paddington

 
TOC(s) affected
Great Western Railway
Description

Engineering work is taking place between Bristol Parkway and Bristol Temple Meads from Tuesday 28 to Friday 31 July, closing some lines.

The 04:53 Bristol Temple Meads to London Paddington service will now start from Bristol Parkway at 04:37. It will next call at Bristol Temple Meads at 04:53 and carry on the journey to Swindon and beyond as normal, arriving in to London Paddington at 06:28.

Check before you travel:

These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.