Amended Elizabeth line service on Sunday 12 October
Engineering work details
Starts Sunday 12 October 2025 to Sunday 12 October 2025
Train operators affected
Route(s) affected
Elizabeth line between Abbey Wood and Heathrow Terminal 4 / Reading, and between Shenfield and Heathrow Terminal 4
Description
Engineering work is taking place between London Paddington and Ealing Broadway, closing some lines.
Trains that usually run between Abbey Wood and Maidenhead will run between Abbey Wood and London Paddington (Elizabeth line platforms) only.
Abbey Wood to Heathrow T4 services will be reduced to 2 trains per hour
The following stations will have a reduced service of 2 trains per hour:
Maidenhead
Burnham
Slough
Langley
West Drayton
Heathrow Terminal 4
The following stations will have a reduced service of 4 trains per hour:
Heathrow Terminals 2 and 3
The following stations will have a reduced service of 6 trains per hour:
Hayes & Harlington
Southall
Ealing Broadway
The following stations will have no train service:
Acton Main Line
Hanwell
West Ealing
For these stations, you should instead use London Underground services from nearby London Underground stations.
The Reading service will call additionally at Iver.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Advertisement