Reduced service to / from Glasgow Central Low Level and Glasgow Queen Street Low Level on Monday 28 December
Engineering work details
Starts Monday 28 December 2026 to Monday 28 December 2026
Train operators affected
- ScotRail
Route(s) affected
All routes via Glasgow Central Low Level / Glasgow Queen Street Low Level
Description
Engineering work is taking place between Glasgow Central Low Level and Partick, closing some lines.
Trains through Glasgow Central Low Level and Partick between Larrkhall / Motherwell and Dalmuir are reduced to 2 trains per hour in each direction.
The remaining trains will operate between Lanarkshire stations and Anderston. Passengers travelling beyond Anderston should change at Glasgow Central Low Level to continue their journey.
Trains operating via Glasgow Central Low Level and Partick:
- Dalmuir to Motherwell via Hamilton: half-hourly (extends to Cumbernauld every hour)
- Larkhall to Dalmuir: half-hourly
Trains operating to/from Anderston only:
- Anderston to Whifflet: half-hourly (extends to Cumbernauld every hour)
- Anderston to Larkhall: half-hourly
- Cumbernauld to Anderston: hourly
- Motherwell to Anderston via Hamilton: half-hourly (starts from Cumbernauld every hour)
Trains operating via Glasgow Queen St Low Level:
- Helensburgh Central to Edinburgh: half-hourly, both directions
- Airdrie to Balloch: half-hourly, both directions
- Milngavie to Springburn: half-hourly, both directions
Check before you travel:
You can plan your journey using the National Rail Journey Planner.
Advertisement
Advertisement