Reduced Thameslink service at London Bridge on Sunday 14 February
Engineering work details
Starts Sunday 14 February 2027 to Sunday 14 February 2027
Train operators affected
- Thameslink
Route(s) affected
Between Bedford and Gatwick Airport / Three Bridges / Horsham / Brighton, between Cambridge and Gatwick Airport / Brighton, between London Bridge and Gillingham (Kent) / Sutton (London) / Horsham / Brighton, between West Hampstead Thameslink / Kentish Town and Rainham (Kent), and also between St Albans City and Gillingham (Kent)
Description
Engineering work is taking place in the London Bridge area, closing various lines.
All day on Sunday, most Thameslink trains will be diverted not to call at London Bridge.
Trains to / from Rainham (Kent) will run between Plumstead and Rainham (Kent) only. You can use your ticket at no extra cost on Southeastern trains between London Bridge and Plumstead.
All other Thameslink services that run via London Bridge will be diverted between London Blackfriars and East Croydon not to call at London Bridge, and to run a revised timetable with extended journey times.
Early morning / late night train services that start / terminate at London Bridge will run to a revised timetable.
Ticket acceptance:
You can use your paper rail tickets at no extra cost on the following services:
London Underground services between Kings Cross St Pancras / Blackfriars and London Bridge
London Underground and Docklands Light Railway services between London Bridge and Woolwich Arsenal
Elizabeth line trains between Farringdon and Abbey Wood
Check before you travel:
You can plan your journey using the National Rail Journey Planner.
You can plan your journey on London Underground / Docklands Light Railway by using the Transport for London Journey Planner.
Advertisement
Advertisement