Reduced Thameslink service to / from London Bridge on Sunday 26 July
Engineering work details
Starts Sunday 26 July 2026 to Sunday 26 July 2026
Train operators affected
Route(s) affected
All Thameslink routes to / from / via London Bridge
Description
Engineering work is taking place in the London Bridge area, closing some lines.
Most Thameslink trains will be diverted and unable to call at London Bridge.
Thameslink Rainham route trains will run to an amended timetable between Plumstead and Rainham. Your tickets will be accepted at no extra cost on Southeastern services between London and Plumstead.
All other Thameslink trains which usually run via London Bridge will be diverted between London Blackfriars and East Croydon, not calling at London Bridge, and run to a revised timetable with extended journey times.
Paper rail tickets will be accepted at no extra cost on:
London Underground services between:
London Bridge and Woolwich Arsenal
Kings Cross St Pancras and London Bridge / Elephant & Castle
Blackfriars and London Bridge / Cannon Street
Elizabeth line trains between Farringdon and Abbey Wood.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner.
You can plan your journey on London Underground by using the Transport for London Journey Planner.
Advertisement
Advertisement