Skip to main content

Reduced Thameslink service to / from London Bridge on Sunday 26 July 

See all service disruptions

Engineering work details

Starts Sunday 26 July 2026 to Sunday 26 July 2026

If you would like to follow this incident on X, please use

Train operators affected

Route(s) affected

All Thameslink routes to / from / via London Bridge

Description

Engineering work is taking place in the London Bridge area, closing some lines.

Most Thameslink trains will be diverted and unable to call at London Bridge.

Thameslink Rainham route trains will run to an amended timetable between Plumstead and Rainham. Your tickets will be accepted at no extra cost on Southeastern services between London and Plumstead.

All other Thameslink trains which usually run via London Bridge will be diverted between London Blackfriars and East Croydon, not calling at London Bridge, and run to a revised timetable with extended journey times.

Paper rail tickets will be accepted at no extra cost on:

London Underground services between:

  • London Bridge and Woolwich Arsenal

  • Kings Cross St Pancras and London Bridge / Elephant & Castle

  • Blackfriars and London Bridge / Cannon Street

Elizabeth line trains between Farringdon and Abbey Wood.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner.

You can plan your journey on London Underground by using the Transport for London Journey Planner.

Advertisement

Advertisement