Amended services to / from London Euston from Saturday 2 to Monday 4 May
Engineering work details
Starts Saturday 02 May 2026 to Monday 04 May 2026
Train operators affected
Route(s) affected
All routes to / from London Euston
Description
Engineering work is taking place between London Euston and Wolverton, closing some lines.
Avanti West Coast:
The following services will run to an amended timetable:
Saturday and Monday:
1 train per hour between London Euston and Liverpool Lime Street
1 train per hour between London Euston and Manchester Piccadilly via Stoke and Macclesfield
1 train per hour between London Euston and Manchester Piccadilly via Crewe and Wilmslow
1 train per hour between London Euston and Glasgow Central via Tamworth and Rugeley Trent Valley
1 train per hour between London Euston and Birmingham New Street (Saturday only)
1 train per hour between London Euston and Blackpool North / Glasgow Central / Edinburgh via Birmingham New Street
Services between London Euston and Holyhead will operate between Crewe and Holyhead only.
Sunday:
1 train per hour between London Euston and Crewe via Tamworth and Rugeley Trent Valley. These trains are affected by engineering work in the Hunts Cross area
2 trains per hour between London Euston and Manchester Piccadilly via Stoke and Macclesfield
1 train per hour between London Euston and Glasgow Central via Tamworth / Crewe / Manchester / Bolton
1 train per hour between London Euston and Warrington Bank Quay via Birmingham New Street
Services between London Euston and Holyhead will operate between Crewe and Holyhead only.
Services between London Euston and Edinburgh will operate between Preston and Edinburgh only.
London Northwestern Railway:
Saturday and Monday:
Train services between London Euston and Tring / Bletchley will not run. Passengers are advised to travel on other services operating between London Euston and Tring / Bletchley.
Trains will run to a slightly amended timetable between London Euston and Milton Keynes Central / Northampton / Crewe.
Some train services between London Euston and Birmingham New Street will depart slightly earlier from / arrive slightly later at London Euston.
Trains between London Euston and Milton Keynes Central / Northampton will not call at Bushey. Passengers travelling to / from Bushey are advised to travel on London Overground services.
Sunday:
Train services will run to a slightly amended timetable between London Euston and Milton Keynes Central / Northampton / Crewe.
Some trains from London Euston to Birmingham New Street will depart slightly earlier from London Euston.
Train services between London Euston and Bletchley / Milton Keynes Central / Northampton / Birmingham New Street / Crewe will not call at Bushey. Passengers travelling to / from Bushey are advised to travel on London Overground services.
London Overground:
No trains will run between London Euston and Kilburn High Road.
If you have a National Rail paper ticket or e-ticket, you can use your ticket at no extra cost on the following operators’ services:
Bakerloo line to / from Kilburn Park for Kilburn High Road
Jubilee line to / from Swiss Cottage for South Hampstead
Northern / Victoria line for Euston
If you are using contactless payment / Oyster card, you can also use the above alternative travel options but you will be required to pay the normal tap in / tap out fares for your journey.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner
Advertisement