Amended service to / from London Euston on Saturday 22 and Sunday 23 March
Engineering work details
Starts Saturday 22 March 2025 to Sunday 23 March 2025
Train operators affected
Route(s) affected
All Avanti West Coast services to / from London Euston
All London Northwestern Railway services to / from London Euston
Description
Engineering work is taking place in the London Euston area, closing some lines.
Avanti West Coast:
Saturday:
Six trains per hour will run to / from London Euston, with one train each hour on the following routes:
London Euston - Birmingham New Street - Scotland
London Euston - Birmingham New Street
London Euston - Liverpool Lime Street (calling additionally at Nuneaton to pick up only)
London Euston - Crewe - Manchester Piccadilly
London Euston - Stoke-on-Trent - Manchester Piccadilly
London Euston - Glasgow Central via Nuneaton
North Wales services to / from Holyhead will run between Holyhead and Crewe only.
Sunday:
Three trains per hour will run between London Euston and Manchester Piccadilly (two via Stoke-on-Trent, one via Crewe).
Additionally, one train per hour will run as follows:
London Euston – Liverpool Lime Street (additional pick-up at Watford Junction and Rugby)
London Euston – Glasgow Central via Nuneaton
Birmingham New Street – Scotland
North Wales services to / from Chester / Holyhead
London Northwestern Railway:
Saturday:
Train services between London Euston and Tring which terminate at / start from Tring will not run. You should travel on other services operating between London Euston and Tring.
Trains between London Euston and Bletchley / Milton Keynes Central / Northampton will not call at Bushey. If you are travelling to / from Bushey, you are advised to travel on London Overground services.
London Northwestern Railway services are not affected by engineering work on Sunday.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Advertisement