Skip to main content

Advertisement

Last updated:Today at 08:04
Train companies affected:Northern

Amended Great Western Railway services to / from London Paddington on Sunday 22 December 

See all service disruptions

Engineering work details

Starts 22 Dec 2024 to 22 Dec 2024

Train operators affected

Route(s) affected

Between London Paddington and Didcot Parkway / Oxford / Cheltenham Spa / Worcester Shrub Hill / Great Malvern / Hereford / Swansea / Carmarthen, and between London Paddington and Swindon / Bristol Temple Meads / Weston-super-Mare / Taunton / Exeter St Davids / Paignton / Plymouth / Penzance

Description

Engineering work is taking place between London Paddington and Slough, closing some lines.

Hereford Route:

Services between London Paddington and Oxford will run a reduced service.

Services between London Paddington and Worcester Shrub Hill / Great Malvern / Hereford will depart approximately 2 minutes earlier than usual, and will not call at Radley. If you are travelling to / from Radley, you should make use of additional train services between Radley, Oxford and Didcot Parkway.

Swansea / Carmarthen Route:

From 10:45, services between London Paddington and Swansea / Carmarthen will depart approximately 2 minutes earlier than usual.

Services between London Paddington and Swindon will run a reduced service, and will call additionally at Slough, Maidenhead and Twyford.

  • The 08:33 London Paddington to Swansea service will depart earlier than usual at 08:23.

  • The 22:45 London Paddington to Bristol Parkway service will depart earlier than usual at 22:37.

Plymouth / Penzance Route:

Services from London Paddington to Exeter St Davids / Paignton / Plymouth / Penzance will depart up to approximately 3 to 10 minutes minutes earlier than usual.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement