Amended service between London Paddington and Ealing Broadway on Sunday 28 January
Engineering work details
Starts Sunday 28 January 2024 to Sunday 28 January 2024
Train operators affected
Route(s) affected
Elizabeth line between Abbey Wood / Shenfield and Heathrow Terminal 5, and between Abbey Wood / London Paddington and Reading
Great Western Railway services to / from London Paddington
Heathrow Express between London Paddington and Heathrow Terminal 5
Description
Engineering work is taking place between London Paddington and Ealing Broadway, closing some lines.
Elizabeth line:
Before 08:00:
No service to operate in the London bound direction between Reading/Maidenhead and Paddington
The 06:53 Reading to London Paddigton service will terminate at Slough
The 07:40 Maidenhead to London Paddington service will run 13 minutes later throughout
After 08:00:
Abbey Wood to Maidenhead services will terminate Paddington Lower Level
Abbey Wood to Heathrow T4 will be reduced to 2 trains per hour
Maidenhead, Burnham, Slough, Langley & West Drayton, will be reduced to 2 trains per hour
Hayes & Harlington, Southall and Ealing Broadway will be reduced to 6 trains per hour
Acton Main Line, West Ealing and Hanwell WILL NOT get a service
Reading services will now call at Iver
Great Western Railway:
An amended timetable will run, with some trains running earlier or later than usual to / from London Paddington.
Heathrow Express:
A reduced half hourly service will run between London Paddington and Heathrow Airport.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
Advertisement