Skip to main content

Advertisement

Amended service between London Paddington and Ealing Broadway on Sunday 28 January 

See all service disruptions

Engineering work details

Starts 28 Jan 2024 to 28 Jan 2024

Route(s) affected

Elizabeth line between Abbey Wood / Shenfield and Heathrow Terminal 5, and between Abbey Wood / London Paddington and Reading

Great Western Railway services to / from London Paddington

Heathrow Express between London Paddington and Heathrow Terminal 5

Description

Engineering work is taking place between London Paddington and Ealing Broadway, closing some lines. ​​​​​​​

Elizabeth line:

Before 08:00:

  • No service to operate in the London bound direction between Reading/Maidenhead and Paddington

  • The 06:53 Reading to London Paddigton service will terminate at Slough

  • The 07:40 Maidenhead to London Paddington service will run 13 minutes later throughout

After 08:00:

  • Abbey Wood to Maidenhead services will terminate Paddington Lower Level

  • Abbey Wood to Heathrow T4 will be reduced to 2 trains per hour

  • Maidenhead, Burnham, Slough, Langley & West Drayton, will be reduced to 2 trains per hour

  • Hayes & Harlington, Southall and Ealing Broadway will be reduced to 6 trains per hour

  • Acton Main Line, West Ealing and Hanwell WILL NOT get a service

  • Reading services will now call at Iver

Great Western Railway:

An amended timetable will run, with some trains running earlier or later than usual to / from London Paddington.

Heathrow Express:

A reduced half hourly service will run between London Paddington and Heathrow Airport.

Check before you travel: 

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement