Buses replace trains between Royston and Cambridge / Cambridge North on Saturday 3 February
Engineering work details
Starts Saturday 03 February 2024 to Sunday 04 February 2024
Download incident map (PDF 223k)(external link, opens in a new tab)
Train operators affected
Route(s) affected
Great Northern / Thameslink services to / from Cambridge / Ely / Kings Lynn
Description
Engineering work is taking place between Royston and Cambridge, closing all lines.
Saturday:
Buses will replace trains between:
Royston and Cambridge.
Royston and Cambridge North (fast, connecting with trains to / from Kings Lynn).
An amended train service will run between Cambridge and Kings Lynn, between Royston and London Kings Cross, and also between Royston / Finsbury Park and Brighton.
Sunday:
Do not travel on the Great Northern or Thameslink network between London, Hertford, Stevenage, Peterborough, Cambridge or King’s Lynn, as there will be no trains or alternative transport options available.
Check before you travel:
If you are travelling on Saturday, you can plan your journey using the National Rail Enquiries Journey Planner
Replacement Bus Travel Advice:
For helpful advice if you need to travel on a rail replacement service, including accessibility and bicycle information, please use this page.
You can find the location of your bus replacement by checking station signs or by searching for your station on our station information pages.
Please be advised that, on occasion, replacement vehicles may be busier than usual, and you should allow extra time for your journey.
Advertisement