Amended and reduced Thameslink services to / from / via London Bridge on Sunday 2 November
Engineering work details
Starts Sunday 02 November 2025 to Sunday 02 November 2025
Train operators affected
Route(s) affected
All Thameslink services to / from / via London Bridge
Description
Engineering work is taking place in the London Bridge area, closing various lines.
Most Thameslink trains will be diverted and unable to call at London Bridge.
Thameslink Rainham route trains will run to an amended timetable between Dartford and Rainham.
All other Thameslink trains which usually run via London Bridge (with the exception of some early morning / late night trains) will be diverted between London Blackfriars and East Croydon, will not call at London Bridge, and will run to a revised timetable with extended journey times.
Paper rail tickets will be accepted at no extra cost on London Bus services to complete your journey to / from London Bridge.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Buses by using the Transport for London Journey Planner
Advertisement