Heavily amended Thameslink service to / from London Bridge on Sunday 15 March
Engineering work details
Starts Sunday 15 March 2026 to Sunday 15 March 2026
Train operators affected
Route(s) affected
All Thameslink services to / from / via London Bridge
Description
Engineering work is taking place in the London Bridge area, closing most of the lines used by Thameslink.
As a result, the vast majority of Thameslink trains will be diverted, and will not call at London Bridge.
Thameslink trains to / from Rainham will run to an amended timetable between Plumstead and Rainham only. Your tickets will be accepted on Southeastern services between London Bridge and Plumstead.
Thameslink trains between Brighton / Three Bridges / Horsham and Bedford / Finsbury Park which usually run via London Bridge will be diverted between London Blackfriars and East Croydon, will not call at London Bridge, and will run to an amended timetable with extended journey times.
Paper rail tickets will be accepted on London Underground services for to complete your journey to / from London Bridge.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner
Advertisement